Brampton Go Station

Owner: METROLINX / GO TRANSIT
 Type: Public Transit / Infrastructure
 Cost: $1,100,000.00
 Architect: TROW ASSOCIATES
 Engineer: UMA / AECOM
G.C: B.GOTTARDO CONSTRUCTION
Challenges: Fully galvanized steel canopies 11ft. Cantilever, about 1000 ft. Long with architectural features along curved rail track alignment. Main entrance building, elevators structures with cottage roof fabricated in shop to archive better quality control

Grade difference of 20 ft. For 20% of canopy length. Erection work carried out with CN Rail regulation & fully operational rail corridor without shutdown, stoppage to service.

 

 

 

imageimageimageimageimage