Pickering Go Station

 Owner: METROLINX / GO TRANSIT
 Type: Public Transit / Infrastructure
 Cost: $420,000.00
 Architect: RIENDERS+RIEDER
 Engineer: RIENDERS+RIEDER
G.C: A PLUS GENERAL CONTRACTOR
Challenges: 100% rolled steel roof structure prime painted entrance building. 40 ft long curved roof trusses made from w beams. Erection work carried out with CN Rail regulation fully operational rail corridor without stoppage to service.

 

imageimageimageimageimage